news

FAA commissions new ATC tower at Charlotte Douglas Airport

0
SHARES

The Federal Aviation Administration has agreed to commission the new and sustainable air traffic control tower at Charlotte Douglas International Airport.

FAA commissions new ATC tower at Charlotte Douglas International Airport

The U.S. Department of Transportation’s Federal Aviation Administration (FAA) has dedicated the newly commissioned and environmentally sustainable air traffic control tower at Charlotte Douglas International Airport (CLT).

“Aviation is an invaluable part of our American life and our national economy. The new, taller control tower will enable the airport to continue to expand its flight operations to grow alongside the vibrant Charlotte economy,” commented FAA Deputy Administrator, Bradley Mims.

The 370-ft-tall air traffic control tower has an 850 square foot tower cab that provides air traffic controllers a bird’s-eye view of the airfield. At the base, a 42,000 square foot building houses an expanded terminal radar approach control (TRACON) that handles flights departing and arriving into the Charlotte airspace. Both are designed to accommodate current and future operations.

“The commissioning of the new air traffic control tower by the Federal Aviation Administration is a testament to the importance of Charlotte in the National Airspace System,” added CLT Chief Executive Officer, Haley Gentry. “The tower is equipped with the latest state-of-the art NextGen technology to keep up with the current and future demand of our growing airfield. This modern infrastructure is another display of the strong partnership we have at CLT and we are grateful to the FAA for this investment to make air traffic more efficient.”

The new Charlotte tower is the second-tallest tower in the nation after the 398-ft-tall tower at Hartsfield-Jackson Atlanta International Airport. The existing tower was commissioned in 1979. The facility’s operational growth, new air traffic control technology and the airport’s addition of new runways and taxiways made the height and size of the old tower obsolete.

A total of 179 FAA employees work at the Charlotte tower and TRACON, 136 in air traffic services and 43 in technical operations. Technical Operations employees install and maintain air traffic control equipment. The tower became operational in late February 2022. The estimated final cost of the project is approximately $94 million. 

ReAD TODAY! 

 


New report from International Airport Review: Securing Airports in an Evolving Threat Landscape

International Airport Review has brought together top voices from across the global aviation security sector, including  International Civil Aviation Organization (ICAO), ACI World, Fraport, Qatar Civil Aviation Authority, Winnipeg Airports Authority, and Smiths Detection to examine today’s most pressing airport security challenges and emerging threats.

This expert-led report provides a strategic assessment of the vulnerabilities facing airports in 2025, encompassing cyber-attacks, drone incursions, evolving geopolitical risks, and emerging technologies.

The result is a practical, insightful guide to strengthening airport resilience, anticipating risks before they escalate, and keeping your airport off the front page

Download the report for free and stay ahead of the security curve – READ FOR FREE NOW!

Share via
Share via
Send this to a friend