FAA Administrator Randy Babbitt breaks ground on new Las Vegas air traffic control facility
Posted: 31 May 2011 | FAA | No comments yet
Randy Babbitt helped break ground for a new, $99 million air traffic control tower…


Federal Aviation Administration (FAA) Administrator Randy Babbitt helped break ground today for a new, $99 million air traffic control tower and radar approach control at McCarran International Airport.
“This project will benefit passengers by enhancing safety and efficiency at the airport, while also providing good jobs for Nevada workers,” said U.S. Transportation Secretary Ray LaHood. “It’s good for the local economy, good for air traffic control and good for the airport.”
“The McCarran International Airport of today is a far cry from what it was when the current tower and TRACON were built,” Administrator Babbitt said. “This brand-new, modernized facility will give air traffic controllers better airfield views and help improve airport efficiency.”
Free webinar – The future of asset management in global aviation
15 January, 2026, 02:00PM GMT
Join this virtual panel to hear from some of the AtkinsRéalis and aviation sector experts as we discuss how asset management is changing and the impact it will have on the future operations of airports throughout the world.
The project includes a 352-foot-tall air traffic control tower and a 52,800-square-foot base building, which will house the Terminal Radar Approach Control (TRACON), air traffic control training simulators, administrative offices and equipment. The current control tower, which dates from the early 1980s, is about 200 feet tall, while the base building is 13,740 square feet.
A taller tower is needed to provide controllers with better airfield views. Additionally, McCarran’s air traffic has increased dramatically since the current tower was built, creating a need for more controller space in both the tower and TRACON.
McCarranInternational Airport was the eighth-busiest U.S. airport in 2010 when it served more than 505,000 flights. The FAA forecasts more than 700,000 annual flights at McCarran by 2020.
The total project cost, including the installation of air traffic control equipment, electronics, power supplies, computers and heating and air conditioning is expected to be about $99 million.
Construction will begin in June 2011 and is expected to be complete in the summer of 2013. The FAA plans to start using the new facility in early 2015, following the installation of electronics, air traffic control and computer equipment, heating and air conditioning, and other systems.
The new McCarran facility is the second major air traffic control construction project the FAA has undertaken in Nevada in recent years. In October 2010, the FAA commissioned a new air traffic control tower at Reno-Tahoe International Airport.
18.9 billion passengers are coming. Is your airport ready for 2026? ✈️
Access the FREE Airport Industry Intelligence Handbook for expert strategies on scaling sustainably, modernising ATM, and securing cargo logistics.
Featuring insights from ACI World, TIACA, CANSO, and ACI EUROPE.












