news

Airport selects construction manager at Risk Terminal A renovations

0
SHARES

Posted: 23 January 2012 | San Antonio International Airport | No comments yet

SpawGlass Contractors Inc, the Construction Manager at Risk Terminal A renovations….

San-Antonio-Airport-System-Logo

The City of San Antonio has selected SpawGlass Contractors, Inc as the Construction Manager at Risk (CMR) for the Terminal A renovations at San Antonio International Airport.

As part of the overall capital improvement plan for the San Antonio International Airport, the City planned to build a new Terminal B and then renovate Terminal A after construction of Terminal B was completed. Terminal B has been completed and opened for operation in November 2010. As planned, the City has begun the Terminal A Renovation Project which will improve and update Terminal A, built in 1984, to make it more consistent with the new Terminal B Building.

“This is an exciting time for San Antonio International Airport. We are going to give a twenty eight year old building a fresh look,” said Frank R. Miller, Aviation Director for The City of San Antonio. “We want to bring Terminal A up the standard we have set with Terminal B, with the look and feel and modern conveniences.”

Join us live: Shaping the Next Generation of Hold Baggage and Air Cargo Screening

Join us live for an insightful webinar on 11th December at 14:00 GMT, in collaboration with Smiths Detection, as we explore the strategic balance of operational efficiency, regulatory compliance, and sustainability in high-volume security environments.

This session offers a focused look into future-proofing your security strategy.

Key learning points

  • Cost Reduction: Strategies to minimize bag travel time while simultaneously reducing operational costs.
  • Regulatory Roadmap: Insights into the next wave of regulatory changes and their impact on future investment decisions.
  • Sustainable Systems: Practical approaches to building sustainability into security systems and lowering the total cost of ownership (TCO).
  • Scalable Solutions: Real-world examples of scalable systems supporting current airport growth and preparing for tomorrow.

Register now for expert insights, case studies, and actionable strategies on operational efficiency!

SpawGlass Contractors, Inc. will collaborate with the City and architectural and engineering firm, Reynolds, Smith, and Hills Inc., during the finalization of design and construction documents. SpawGlass Contractors, Inc. will provide constructability reviews, budgeting, cost estimating, and phasing, scheduling, presentation to stakeholders, and value engineering. Construction on Terminal A will include renovations to the interior finishes, signage, restrooms and furnishings.

“SpawGlass is excited to continue our work at the San Antonio International Airport with the Renovation of Terminal A,” said Chuck Calvin, SpawGlass President, San Antonio Region. ”The airport is often considered the gateway to our city, and we recognize the importance of making this renovation a positive experience for visitors, airport personnel, city officials and our community.”

Additionally, replacement and upgrades to mechanical, electrical and plumbing infrastructure/controls, replacement and upgrades of escalators and elevators, curbside ADA upgrades, sprinkler system upgrades, and miscellaneous building system repairs and replacement are planned. Project construction is anticipated to begin in May 2012 and is estimated to be completed by late Fall 2013.

Reserve your FREE place 

 

Join our free webinar: Beyond silos: How ecosystem thinking elevates the airport experience

In today’s complex aviation landscape, airports are moving beyond siloed operations to embrace a new era of collaboration. This webinar focuses on how leading airports are using ecosystem thinking to adapt, personalize, and continuously improve every touchpoint, boosting both passenger satisfaction and non-aeronautical revenue.

Date: 13 Nov | Time: 10:00 GMT

REGISTER NOW TO SECURE YOUR SPOT

Can’t attend live? No worries – register to receive the recording post-event.

Send this to a friend