Balfour Beatty wins £64 million Dubai Airport contract
Posted: 6 February 2013 | Balfour Beatty | No comments yet
Balfour Beatty announced that BK Gulf LLC has been awarded a £64 million mechanical and electrical engineering contract…


International infrastructure group Balfour Beatty plc announced today that BK Gulf LLC, its joint venture in Dubai, has been awarded a £64 million (377.8 million AED) mechanical and electrical engineering contract to work on a project that will help Dubai International Airport deal with millions more passengers each year.
The contract, which has been awarded by the Dubai Aviation Engineering Projects (DAEP), through local contracting company Al Jabber L E G T Engineering & Contracting (ALEC) as main contractor, is to install the electrical, ventilation, air conditioning, plumbing and fire protection systems in the new airport concourse facility that will also include new aircraft stands and passenger boarding lounges.
BK Gulf will be using their innovative manufacturing system whereby installation of mechanical and electrical services consisting of pipes, ducts, power and containment systems is undertaken off-site before engineers are given access to the work area. This helps to speed up the onsite installation process, reduces potential for accidents on site and means that systems are custom built to the highest quality in BK Gulf’s purpose built facility.
Join us live: Shaping the Next Generation of Hold Baggage and Air Cargo Screening
Join us live for an insightful webinar on 11th December at 14:00 GMT, in collaboration with Smiths Detection, as we explore the strategic balance of operational efficiency, regulatory compliance, and sustainability in high-volume security environments.
This session offers a focused look into future-proofing your security strategy.
Key learning points
- Cost Reduction: Strategies to minimize bag travel time while simultaneously reducing operational costs.
- Regulatory Roadmap: Insights into the next wave of regulatory changes and their impact on future investment decisions.
- Sustainable Systems: Practical approaches to building sustainability into security systems and lowering the total cost of ownership (TCO).
- Scalable Solutions: Real-world examples of scalable systems supporting current airport growth and preparing for tomorrow.
Register now for expert insights, case studies, and actionable strategies on operational efficiency!
Balfour Beatty CEO Designate, Andrew McNaughton, said: “We are delighted to be involved in this project which will help benefit millions of air travellers. Transportation is a key strategic area for us and aviation is right at the heart of that.”
“We are always looking to deliver the best possible results for our clients in the most efficient and sustainable way we can. This project is no exception where we have a design solution that will mean the new facilities we install will be powered by renewable energy through photovoltaic and solar panels.”
Dubai International Airport hosts between 60 and 75 million passengers each year through its existing and newly opened facilities. This new facility, to be known as Concourse D, is part of the airport’s expansion programme that will increase its capacity to deal with 90 million passengers per year by 2018.
Work has commenced, with the project due for completion by the end of 2014.
The International Airport Summit is open for registration!
Date: 19 – 20 November 2025
Location: JW Marriott Hotel Berlin
At our flagship event of the year, we will dive into the future of airport operations, with expert-led sessions on passenger experience, innovative smart technologies, baggage handling, airside operations, data, security, and sustainability.
This is where global airport leaders come together to share insights, challenges, and real-world solutions.
Limited complimentary passes are available for eligible professionals – first come, first served!












